Thank you for your patience while we retrieve your images.
Taken 28-Apr-07
Visitors 700


« Previous Next »
86 of 177 photos

UWR trackbed

During the contruction of the tunnel, a 2 foot gauge line emerged from Adit 5 to cross the Upper Works Railway and onto the spoil tip.
UWR trackbed